Completion of the Trial Shaft work

The latest update follows the completion of the Trial Shaft work, GBI is working with CMZ to prep and drill the Load Test Shaft, with the concrete pour scheduled for 3/14/25. At the same time, GBI is importing coral fill material to be compacted and placed in the future roadway location. Additionally, the State has recently acquired a parcel that allows work to commence in the Waimea side of the project. GBI went ahead and cleared the area, placed protective barriers and erosion control measures in preparation for grading work.

Blind Renaissance
Since 1972, Blind Renaissance has an extensive history of creating the strong visual identity and cohesive media presence demanded by the sophistication of marketing environments. We design engaging, client-specific promotional materials by combining an educated artistic sensibility, knowledge of advertising trends in multiple industries and the ability to appropriately utilize new design, web and printing technology.
http://www.icblind.com
Previous
Previous

Load Test Shaft Concrete Pour Completed

Next
Next

March 2025